top of page
ChatGPT Image Jan 30, 2026, 09_27_35 PM (1).png

PROJECT TRANSFORMATIONS

From existing site conditions to fully engineered, compliant, and functional environments  delivering measurable improvements in performance, safety, and long-term value.

ChatGPT Image Feb 11, 2026, 02_48_28 PM.png

01

Construction of Courtyard/Access Road

For the Redevelopment of

2300 Connecticut Avenue NW, Washington, DC

a high-visibility urban project requiring coordinated infrastructure and site development execution. Working alongside an international construction firm, our team delivered the essential site infrastructure and exterior improvements needed to support the overall redevelopment of the property.

BEFORE AND AFTER PHOTOS
ChatGPT Image Feb 18, 2026, 01_43_58 PM.png

02

LIBYAN AMBASSADOR’S RESIDENCE

WASHINGTON, DC.

This project was executed under a Design-Build delivery model, allowing for seamless integration between design, documentation, construction management, and post-construction support.

ChatGPT Image Feb 11, 2026, 02_50_48 PM.png
BEFORE AND AFTER PHOTOS
ChatGPT Image Feb 18, 2026, 02_53_01 PM.png
ChatGPT Image Feb 11, 2026, 02_15_21 PM.png

03

Refurbishment of the
Embassy of Malaysia
Annex Chancery

1900 24th ST NW, Washington D.C. 20008

Insight Engineering partnered with the Embassy of Malaysia to deliver the complete renovation and remodeling of two residential properties located at 1900 24th Street NW in Washington, DC. This project was executed under a Design-Build delivery model, allowing for seamless integration between design, documentation, and construction management.

BEFORE AND AFTER PHOTOS
ChatGPT Image Feb 18, 2026, 11_18_44 AM.png

04

Refurbishment of the MARA Building

at MARA Student Office

Embassy of Malaysia Chancery Annex
1501 18th ST NW, Washington D.C. 20036

Insight Engineering delivered the complete renovation and remodeling of the Malaysian MARA office building located at 1501 18th Street NW in Washington, DC. This project was executed under a Design-Build delivery model, allowing for seamless integration between design, documentation, and construction management.

ChatGPT Image Feb 11, 2026, 02_41_39 PM.png
BEFORE AND AFTER PHOTOS
ChatGPT Image Feb 20, 2026, 09_55_43 PM.png
ChatGPT Image Feb 11, 2026, 02_06_12 PM.png

05

Construction of the
Embassy of Malaysia

3516 International CT, Washington D.C. 20008

Insight Engineering partnered with the Embassy of Malaysia to deliver the complete construction of the Malaysian Embassy facility in Washington, DC. Executed under a Design-Build delivery model, this project integrated planning, architectural design, engineering, documentation, construction management, and post-construction support into one streamlined process.

BEFORE AND AFTER PHOTOS
ChatGPT Image Feb 20, 2026, 10_59_45 PM.png

© 2020 by Insight Engineering, Inc.

bottom of page